Petka, Požarevac
- Power: 9,95 MW
- Client: JP EPS
- Project Type: Project design
About this Project
In 2016 CEEFOR was awarded to development of Pre-feasibility study for the Facility for production electricity, power 9.9 MW in the working unit “Plant” using backpressure steam turbine, for the Investor JP EPS, department „RB Kolubara“ Serbia.
Related Projects
Wind farm Kostolac
During 2018 the Consortium with CEEFOR as a leader is developed Project for building permit for the Wind farm in Kostolac
Termovent
A solar power plant and a canopy with solar panels and electric chargers, which will enable users to power electric cars.
Solaris, Kladovo
We developed a feasibility study and main projects design for two PV Plants in Serbia which are located in Kladovo.